Roof Panel Aluminium Sheet Making Roll Forming Machine

Roof Panel Aluminium Sheet Making Roll Forming Machine

Roof panel aluminium sheet producing roll forming machine 
FATURES:
one.Guide Decoiler or CZPT Decoiler with Split is outfitted optional for roll forming creation.
2.Handbook Roller Shearer just before Roll Forming is the essential for roll forming manufacturing, and duration manage is set on touchable monitor, so that materials is calculated by PLC for each content thickness and shade creation.
3.Refine metal plates in 22 mm as Sidewall of device is used.
four.fourteen – twenty Nos of Rollers is utilised for roll forming, making sure profile strength.
5.Mitsubishi (Japan) PLC and five.7′ Touchable Monitor are utilized for for information processing and environment.
1.Panel drawing in accordance to clients request

2.Equipment Strategy parameters 
(1) Processing content: aluzinc/galvanized metal/colored steel coil
(2) Materials thickness: .3-.8mm
(3) Powerful width:900mm
(4) Feeding width:1000mm
(five) Primary motor electrical power: fourkw 
(6) Pump power: 4kw
(seven) Shaft diameter: 75mm
(8) Forming methods: onethreemeasures
(nine) Roller content: forty five# forged metal, with challenging chrome plating 
(ten) Major body: 300H metal
(11) Medium plate thickness: 1mm
(twelve) Manage systerm: Delta PLC control method with touch display
(thirteen) Cutting blade substance:Cr12
(14) Velocity:aboutten-12meter/min
(fifteen) Drived by Chain:one inch
(sixteen) Equipment size (mm):6500*1500*1threemm
(seventeen) Equipment bodyweight: about 3 ton
(eighteen)voltage:380/220V,50hz,3phase in accordance to your request
3.Components of production line

No. Title Device Qty
one Main forming device established 1
two PLC handle method established one
3 CZPT pump station set 1
4 CZPT motor set one
six five ton Manual decoiler set one
seven Out place table  set 2

4.Some machine photos for your reference. 

five.CZPT export packing : 
one. one*forty GP container  main device bare and fastened with iron wire in the container. 
2.rollers were painted with oil and packed with plastic film. 
3.electrics products be packed with picket box.for CZPT export packing. 
for Roof Sheet Trapezoidal Steel Roll Forming Device Supplier.

6.CE certification
Our firm has always been adhering to the basic principle of integrity first, quality very first, above the many years, we have usually put quality and popularity in the 1st location, every single machine, our complex personnel decide on the very best high quality uncooked supplies, due to the fact great uncooked components can create higher-good quality equipment,And our company has handed the quality certification and tests,We think that your selection is proper, because our firm will by no means let our consumers down.

7.Firm advantages 

one. Installation and training:

A.If buyers visit our factory and check the machine, we will teach you how to install and use the machine, 

and also trainyour workers/technician face to face.

B.Without visiting, we will send you user manual and video to teach you to install and operate.

C.If buyer needs our technician to go to your local factory, please arrange board and lodging and 

other necessary things.

two. after Service
A.One year guarantee for whole machine.
B.24 hours technical support by email or phone phone.

C.If there is any difficulty identified of the device, we will restore it for cost-free in one particular 12 months.

8.Some others samples 

FAQ: 1. Does a single device can only make one design panel profile?

Not exactly.For broader and double layer producing device. It can create more than 6 kinds of panels.

two. Do you have following sales help?

Indeed, we are pleased to give tips and we also have expert technicians CZPT across the planet.We needyour devices managing in buy to maintain your organization working.

3. How to visit your organization?

A.Fly to ZheJiang airport: By high pace practice From ZheJiang Nan to HangCZPT Xi (one hour), then we can pick up you.

B.Fly to ZheJiang Airport: By substantial pace practice From ZheJiang Xihu (West Lake) Dis.ao to HangCZPT Xi (four.five hrs), then we can select up you.

4. What can you do if the device damaged?

Our machine’s warranty period is 12months, if the broken components are unable to fix, we can send the new elements substitute the broken parts freell, but you need spend the categorical value yourself.if after warranty interval, we can via negotiationfor to resolve the problems, and we offer the specialized assist for the whole lifestyle of the equipment.

5. Can you be dependable for transport?

Yes, please explain to me the location port or address.we have wealthy experience in transport.

6. You are Trade Business or manufacturing facility?

We are Manufacturing facility.

7. Why your price is increased than other individuals?

As we persist on that each and every factory ought to place good quality at the first place. We commit time and cash on building how to make devices considerably far more automatic, correct and substantial top quality. We can make positive that our machine could use far more than twenty several years CZPT any difficulty. We can offer 2 years cost-free quality assurance.

eight. How prolonged the device could be manufactured?

Normally speaking, welded pipe generating equipment could be manufactured CZPT 45 working times. If you require devices in a hurry, we can make it for you much less than a month.
Welcome to pay a visit to our manufacturing unit for inspection! please get in touch with Bella Tel/ 18231723279

 

Roof Panel Aluminium Sheet Making Roll Forming Machine

Tags