Old Mitsubishi Kone Elevator Modernization Upgrading

Old Mitsubishi Kone Elevator Modernization Upgrading

Old CZPT Modernization Solutions

 

If preserved effectively and in normal use predicament,the typical serive lifestyle of elevator is 15years.With the elevator services time countiuning, equally the mechanical and electrical parts are ageing and much less fuctional. Therefore, the protection of elevator is degrading and likely chance is getting substantial. Nova CZPT has prosperous and top encounter in lift modernization area,specially in the control and drive method.Dependent on our earlier expertise and market demand from customers,we have geared up a number of built-in modernization remedies to our clients jointly with financial and qualified spare areas.
 
CZPT, functioning together with its clients develops CZPT options for the modernization of the more mature elevators combining the price usefulness with the maximum top quality result.
 
CZPT ELEVATOR MODERNIZATION Solutions cover:
1. Relaxed transportation with emphasis on the passengers’ safety
two. Power financial savings
three. Higher overall performance amounts
4. Fantastic compatibility
5. Minimization of the maintenance charges
6. Modern design and style

 

Part NO Product SPECIFICATION
I Mechanical Areas
1.1 Traction Machine VVVF Geared Machine or PM Gearless Equipment
1.2 Traction Machine Mattress Established Manufactured for the changed Traction Machine
one.3 Velocity Governor Nova CZPT
one.4 Pulley Sheave For previously mentioned traction device
one.five Wire Rope For over traction device & speed governor
1.6 VVVF CZPT Operator Replace the current outdated doorway program
1.seven Landing CZPT System
 
II CZPTal Areas
2.1 Full Control Cupboard VVVF in Serial or Parallel system, two.2-37 KW, 220V/380V
two.two Encorder with Cable Mounted in the Traction Device
two.3 Auto Best Board Mounted in the Automobile Prime Inspection Box.
2.four Exhibit Board for COP and LOPs Installed in the COP and LOPs. 
2.five Vehicle Instruction Board Set up in the COP.
two.6 COP    You may possibly pay a visit to our web site to pick the design you need to have: http:///trade/6-COP-LOP.htm
2.7 LOPs 
two.8 Vehicle Top Inspection Box    CZPT CZPT
.9 Pit box CZPT CZPT
two.ten Leveling Photoelectric Swap DC24V Typically Open
2.11 Limit Swap Typically Near
two.twelve All Cable  
2.12.1 Traveling Cable From Control Cupboard to Automobile top Inspection Box.
two.twelve.two Spherical Shaft Cable From Management Cabinet to Limit Siwtchs.
two.twelve.three Spherical Shaft Cable From Handle Cabinet to Pit Switch
two.12.4 Landing CZPT Lock Cable From Manage Cabinet to Landing CZPT CZPT.
2.12.5 LOP Communication Cable From Management Cupboard to LOPs.
2.twelve.six Car Best Department Cables From Vehicle Prime Inspection Box to COP, CZPT Operator, Mild Curtain and so on
 
III Other Opitional Areas
3.1 Group Managing Board For 3-8 units raise
3.two Personal computer Monitoring Board Quarter Checking
three.three ARD Match to Manage Cabinet
three.four UPS Unexpected emergency Power for Brake
3.five IC Card Set up in the COP and LOPs. 
three.6 Voice Announcement Broadcast to the floor data
three.7 Vice COP    For operate-by way of doorway

 

If you are interested in our old modernization, welcome to speak to us as under.

 

Make contact with Individual: Ms. Jessie Chi
  a hundred and eighty 136 10266
   
   
World wide web: http:// 
http://
  novaelevator06

 

Old Mitsubishi Kone Elevator Modernization Upgrading

Tags