Cold Drawn or Cold Rolled Seamless Alloy Steel Tube as Per ASTM A519, BS 6323, ASTM A213, En10305-1, DIN 17175

Cold Drawn or Cold Rolled Seamless Alloy Steel Tube as Per ASTM A519, BS 6323, ASTM A213, En10305-1, DIN 17175

Part I: Merchandise INTRODUCTION

1. Commodity: Cold drawn/chilly rolled seamless alloy metal tube

two. CZPT specification&metal quality: 

ASTM A213 T2,T5,T9,T11,T12,T22,T23,T91,T92
ASTM A335 P1,P2,P5,P9,P11,P12,P22,P23,P91,P92
ASTM A519 SAE4130,SAE4140,SAE4145,SAE4340,SAE8620
EN 15716-2 16Mo3,14MoV63,10CrMo5-five,13CrMo4-5,10CrMo9-10,11CrMo9-10,25CrMo4
EN 10305-1 25CrMo4,42CrMo4
BS 6323-1 CFS9, CFS10,CFS11
BS 6323-4 CFS9, CFS10,CFS11
Other specification JIS, GB, BS,and so on

three. Measurement variety:

OD: upto 356mm
ID: upto 340mm
W.T: not limited

four. Manufacture strategy: Cold rolled, Chilly drawn, CZPT cold drawn

five. Delivery Condition:

BK BKW BKS GBK NBK Q+T
+C +LC +SR +A +N
Chilly rolled Cold drawn Stress relieved Annealed Normalized Quenched+Tempered

six. End finish: simple finishes with sq. cuts,bevelled ends.

seven. CZPT export packing: in bundles tied with metal strips. Interior and external oil coating. External packing by PVC baggage and knit luggage.

8. CZPTized packing or marking are CZPT on request.

Cold ROLLED SEAMLESS TUBES:

Cold DRAWN SEAMLESS TUBES:

HYDRAULIC Cold DRAWN SEAMLESS TUBES:

 

Component II: Usually Questioned Inquiries
1. MOQ: 
CZPTly Min Get Quantity can be two-3 tons/measurement for tubes with OD beneath 250mm, and 10 tons/dimension for tubes with OD over 250mm. At times, it relies upon on steel grade you need. If you need particular quality like E410, E470 or alloy steel tube, MOQ must be ten tons/size at the very least. 
2. Shipping Time: CZPTly, our delivery time is close to 20-40 times based on the dimensions and grades.
3. Guarantee&Ensure: Warranty&guarantee interval is 6 months considering that we produce the tubes, and we are not accountable for good quality difficulty induced by mistaken unloading or storage soon after shipment. We welcome customer’s inspection before shipment. 
four. Payment Method: We take payment approach like T/T, L/C, or D/P, but it depends on our investigation about consumers. We have a solution to evaluate the credit history of clients from all over the planet, and time and sum of D/P we can launch is determined by the analysis. 
five. Good quality Handle: We purchase uncooked materials from steady suppliers who are top metal mills, and we inspect the uncooked substance as for every the requirements. In the course of our production procedure, there is inspection and quality handle in each and every phase.

Portion III: Company INTRODUCTION
We are a manufacturer of chilly drawn, cold rolled, and hydraulic chilly drawn metal tubes with OD upto 356mm considering that 2002. Covering an region of about 32000M2, we have twelve regular workshops with  two hydraulic cold drawing benches, four chain cold drawing benches, and two ERW mills. Our facilities covers all the manufacturing procedures from pickling, chilly drawing,heat treating,saw cutting, straightening,inspection,packing to further machining &turning, cold drawing die fabrication, and products repairation&upkeep.

Factory Look:

Raw Substance Inventory: 

HYDRAULIC Chilly DRAWING: 

STRAIGHTENING:

Saw Reducing: 

Heat Dealing with FURNACE:

 

Cold Drawn or Cold Rolled Seamless Alloy Steel Tube as Per ASTM A519, BS 6323, ASTM A213, En10305-1, DIN 17175

Tags