Automatic Bottle PE Film Heat Shrink Tunnel Packing Wrapping Machine

Automatic Bottle PE Film Heat Shrink Tunnel Packing Wrapping Machine

Solution description:

Automated bottle PE Movie heat shrink tunnel Packing Wrapping Device  
 

I, CZPT parameter: 

Facility overall dimensions: L12000*W1100*H2100mm
Facility all round measurement: Major equipment: L12000× W1100× H2100mm
Shrinkage equipment: 4200× 1100× 1700mm
Wrap max size: L240× W650× H450mm
Shrinkage film materials: PE
Shrinkage movie thickenss: .03-.15mm
Thermo shrinkage tunnel max temperature: 160 – 260° Adjust at will
Max output for each moment: 20 pack/moment
Facility electrical power: 25Kw
Real energy: 20Kw/h

Ii, Facility fundamental collocation:

OMRON: PLC managing system
WEINVIEW: Touch Monitor
ZheJiang Airtac pneumatic element 1set
ZheJiang Telta transducer 2set
Stainless steel wing heating tube 12PCS
China-United states of america cooperation Teflon convey belt.
ZheJiang HEMEI motor and HangCZPT Taili worm derailleur.
South Korea Autonics photoelectrical change, technique witch
Thermo sealing knife aluminum casting heating board, even temperature, long usage existence,
Our company special creation
Complete equipment physical appearance plastic spray, equipment rack undertake to higher-good quality carbonated steel, main element undertake to stainless steel.
Picket scenario and wrap film separate deal.

CZPT necessity:

1, Package deal sort:

(one)350/five hundred/550/600ml big bag: four*6, four*five Little bag, 3× four, 3× 5 4 kind of deal.

(two)1L/1.5L/2L/two.5L massive bag: 3*three, three*four Modest bag, 2× 2, 2× 3 four kind f bundle

two, Regarding can, we propose undertake to package deal with tray, pack steadily.

3, Package pace: 16-20bag/min

4, Fulfill with pre-treatment method filling speed of filling equipment.

(one) 350/five hundred/550/600ml
massive bag: 4*six, four*five, (24000-29000b/h),

Little bag: 3*5, three*four, (15000-18000b/h).

(2)1L/one.5L/2L

massive bag: 3× 4, 3× 3(10000-14000b/hour),

Modest bag: 2× 3, 2× two(5000-7000b/hour).

five, Bundle materials:

PE thermo shrinkage film width(two hundred-600mm), Thickness(.03-.12mm)

 
 
Principal ingredient depth checklist
 

no Identify specification variety brand name
1 board creation ingredient      
2  Plant metallic component      
3 pneumatic ingredient   one SMC
four CZPT controlling component and accent
  Photoelectric swap   one South Korea Autonics
    Proximity switch   four South Korea Autonics
PLC   one OMRON
Touch display   1 WEINVIEW
Frequency converter     two ZheJiang Telta
AC contactor   nine France Schneider
Mid-relay   twelve France Schneider

Loading listing
 

  NO Name Product Quantity Remark
1 Computerized film wrappage device     1 established  
2 Bottle convey equipment     1 established  
3 Thermo shrinkage bundle equipment     one set  
four Convey device rack     1 set  
five Wing heating tube   Stainless iron two piece  
6 Thermo-sealing reducing     one unit  
7 Pressed rubber     one set  
8 AC contactor     1 device  
9 Middle relay     2 units  
10 High temperature fabric     1 piece Stainless metal
11 Movie for device testing     two rolls  
12 Thermo-couple     one piece  
13 Equipment     1 established  
fourteen Temperature control meter instruction           
15 Frequency converter instruction     1 piece  
sixteen Operation use instruction     1piece  

                              
                   10pack/moment L product shrink wrapping device

20pack/minute type linear wrapping device with pad feeding

container loading photos

Carton film wrapping fracture:

shrink wrapping machine for carton movie wrapping and shrink  with bend roll conveyor

Some key affair that client interest as adhere to:

Installation:

Right after tools reached the workshop of client, location the products in accordance to aircraft layout we provided. We will organize seasoned technician for gear set up, debug and test generation at the exact same time make the equipment achieve the rated producing capacity of the line. The consumer need to provide the round tickets and accommodation of our engineer, and the salary.
We will ship engineer, customer pay out ticket change and again, and engineer every working day usd50 value.

 
How lengthy time for installation?

 Following machine get there nearby, if consumer all set raw substance, link water pipeline and electricity, after prepared visa, we will ship technician as consumer venture predicament to shopper manufacturing unit, it will get about fifty percent thirty day period set up, fifty percent month train personalized engineer how to use and keep equipment.  

Training machine use and sustain

Our firm supply technology education to consumer. The content of education is construction and servicing of equipment, control and procedure of products. Seasoned technician will guide and establish education define. Following training, the technician of customer could learn the procedure and servicing, could alter the approach and treat diverse failures. 

Machine high quality Ensure

We promise that our merchandise are all new and not used. They’re manufactured of ideal content, adopt new design and style. The good quality, specification and perform all meet the demand from customers of agreement. We promise that the merchandise of this line could storage for a single 12 months CZPT incorporating any aseptic.

Following income

Right after checking, we offer you twelve months as high quality guarantee, free offer you wearing elements and supply other parts at the cheapest price tag. In high quality assure, the technician of consumers ought to work and preserve the equipment according to seller’s demand from customers, debug some failures. If you could not solve the troubles, we will information you by cellphone if the difficulties are even now can not remedy, we will organize technician to your manufacturing unit resolving the issues. The expense of technician arrangement you could see the price treatment approach of technician. 

After sales

After examining, we provide twelve months as quality promise, free provide donning areas and offer other components at the cheapest cost. In top quality guarantee, the technician of purchasers should function and sustain the tools according to seller’s need, debug some failures. If you could not solve the issues, we will guidebook you by cellphone if the difficulties are nevertheless can not fix, we will arrange technician to your manufacturing unit solving the troubles. The cost of technician arrangement you could see the cost therapy approach of technician. 
 

Can we see machines procedure at our country ?

A1: We have installed a lot of undertaking at a lot of nations. If u require see, we require talk consumer that who bought from us, if they enable, then we will tell u contact info , u can go to them.

We recommend customer appear pay a visit to our company, u can know our organization and see our machines operation at workshop.

We will organize automobile go decide up from close by train station or airport.

 Welcome regional joint us.
 

We will provide technology:

We will make solution as customer bottle measurement, workshop space,price range…

We can aid client design bottle and label. Make workshop layout as area dimensions.
 

CZPT parts:

will send out 1 12 months spare parts with machines with each other.
 

Are u investing organization or producer ?

We are maker, we have very own export company.
 

Shipping and delivery time: thirty-60day
 
What data want to supply ahead of we make provide answer.
 

  1. Bottle kind , bottle dimension, potential requirement
  2. Supply water top quality report.
  3. Device prerequisite: or u can tell us u want label bottle type,finally product picture, we will give suggestions from our experience.

 

Automatic Bottle PE Film Heat Shrink Tunnel Packing Wrapping Machine

Tags